Web Map
Location
News
Santander Info
|
GIM>Research>Publications |
PUBLICATIONS originated within the project: "Medea+ 2A708 LoMoSa+..." ordered by date |
|
2009 |
|
H. Posadas, J. Castillo, D. Quijano, V. Fernández, E. Villar, Marcos Martínez (DS2)
"SystemC Platform Modeling for Behavioral Simulation and Performance Estimation of Embedded Systems"
L. Gomes and J. M. Fernandes (Eds.): “Behavioral Modeling for Embedded Systems and Technologies: Applications for Design and Implementation”, IGI Global. 2009-07 |
|
|
|
2008 |
|
M. Díez, E. Villar, M. Martínez (DS2)
"HdS code generation tool development"
Deliverable DS2-T4.5-Q2-08 of the Medea+ 2A708 LoMoSa+ Project. 2008-08 |
|
|
|
2007 |
|
J. Castillo, H. Posadas, E. Villar, Marcos Martínez (DS2)
"Energy Consumption Estimation Technique in Embedded Processors with Stable Power Consumption based on Source-Code Operator Energy Figures"
XXII Conference on Design of Circuits and Integrated Systems, DCIS'07 . 2007-11 |
|
|
|
|
H. Posadas, D. Quijano, E. Villar, Marcos Martínez (DS2)
"Protocol Bus Modeling using inheritance with TLM2.0"
Proceedings of the Forum on Design Languages, FDL'07. Barcelona. 2007-09 |
|
|
|
|
J. Castillo, H. Posadas, D. Quijano, P. Sánchez, E. Villar
"HdS modeling library"
DS2-T3.4-Q2/07 Deliverable of the Medea+ 2A708 LoMoSa+ Project. 2007-06 |
|
|
|
|
E. Villar, H. Posadas, Marcos Martínez (DS2)
"Efficient HdS simulation for MpSoC with NoC"
MEDEA+ Design Automation Conference, Grenoble. 2007-05 |
|
|
|
|
H. Posadas, D. Quijano, E. Villar, M. Martínez (DS2)
"SCoPE: SoC co-simulation and performance estimation in SystemC"
Software demonstration at the DATE’07 University Booth, Nice, April, 2007. 2007-04 |
|
|
|
2006 |
|
H. Posadas, D. Quijano, E. Villar, F. Escuder (DS2), M. Martínez (DS2)
"TLM interrupt modelling for HW/SW co-simulation in SystemC"
XXI Conference on Design of Circuits and Integrated Systems, DCIS'06 . 2006-11 |
|
|
|
|
D. Quijano, H. Posadas, P. Sánchez, E. Villar, Marcos Martínez (DS2)
"Specification of HdS modeling methodology"
DS2-T3.4-Q2/06 Deliverable of the Medea+ 2A708 LoMoSa+ Project. 2006-06 |
|
|
|
|
|